Reduce specification risk
Drawings, dimensions, lighting, mounting, finish, and packaging details are reviewed before the order moves deeper into production.
About Us
Custom LED mirrors and mirror cabinets developed around drawings, installation details, project schedules, and repeatable production.

01Who We Are
We support mirror brands, distributors, hospitality suppliers, contractors, developers, and design teams. Our role is to understand the design intent, identify manufacturing risks, refine technical details, and establish an order-specific route before mass production.
02Why Partner With Us
The value of a manufacturing partner is measured in the work that happens before and between production steps.
Drawings, dimensions, lighting, mounting, finish, and packaging details are reviewed before the order moves deeper into production.
Sales, engineering, production, quality, and logistics work from the same approved information as the project develops.
Room types, model codes, phased quantities, carton marks, and inspection checkpoints can be organized for project orders.
03Manufacturing Capability
Production capability is reviewed against the proposed construction and quantity. You can confirm the relevant glass, frame or cabinet, lighting, assembly, inspection, packaging, and dispatch processes before commitment.
04What You Can Verify
A factory review should connect equipment and people to your actual mirror construction. These are the checkpoints we recommend confirming for the quoted model and order.

Confirm mirror, metal, cabinet, LED, driver, hardware, and finish requirements against the approved specification.

Review cutting, edging, drilling, backing, demister position, and visible-surface protection for the selected construction.

Align material, profile, joint treatment, finish sample, door gaps, shelves, and hardware before release.

Define LED layout, color temperature, driver, controls, wiring exit, voltage, plug, and optional functions by model.

Use approved drawings and samples to control dimensions, fit, mounting parts, labels, and accessories.

Agree the plan for appearance, dimensions, lighting, electrical functions, assembly, and order-specific tests.

Confirm protection, carton construction, accessories, carton marks, pallets, or crates for the shipment route.

Coordinate room types, model codes, phased quantities, packing lists, loading, and shipment documents.

05Engineering & Customization
Frame depth, lighting position, mounting structure, electrical configuration, installation clearances, finish, labeling, and packaging can affect the final product. These details are reviewed before sampling and production.
06Factory Review Pack
A useful factory review connects the quoted construction to the people, equipment, records, and release checks that support it.
Confirm who owns engineering review, production coordination, quality release, packing, and shipment communication.
Review the relevant cutting, edging, drilling, frame, cabinet, lighting, assembly, and testing capability for the selected model.
Align drawings, material details, sample approvals, inspection criteria, labels, and packing instructions before production release.
Confirm protection, carton identification, loading sequence, packing lists, and order-specific shipping documents.
07Project Journey
A controlled path for custom and project orders.
08Quality
Quality alignment starts with approved requirements and continues through materials, manufacturing, assembly, testing, identification, and packing.
Our quality process
09Sample & Development
Where sampling is required, it becomes the reference for dimensions, appearance, lighting, functions, construction, mounting, labels, and electrical configuration.
Discuss sample requirements
10Built for Projects
Project orders may include repeated room types, specification revisions, phased quantities, carton identification, and coordinated delivery dates.

11People Make the Difference
Sales, engineering, production, quality, and logistics roles stay connected to the same approved project information.

12Quality Verification
Inspection criteria should follow the approved model, drawing, sample, destination, and purchase requirement. The applicable checks are agreed before production instead of assumed after shipment.
Specific sampling levels, test standards, compliance documents, and inspection records remain model- and order-dependent.
13Project Review Package
The available document set is confirmed for the selected product and order. This avoids treating a company-level file as proof for every model.
14Factory Review Checklist
Use this short checklist when reviewing a proposed model, requesting evidence, or preparing a factory visit.
14Project Questions
The right answer depends on the selected model, construction, quantity, destination, and approved project documents. These are the questions to clarify early.
MOQ is confirmed by product type, customization level, and production plan.
Timing depends on drawing readiness, component selection, approval rounds, and sample complexity.
Factory and process reviews can be arranged around the quoted construction and order requirements.
The applicable drawings, specifications, inspection records, packing details, and compliance documents are confirmed per model and order.
Carton marks, protection, pallets or crates, packing lists, and shipment labels are aligned to the project route.
Send a drawing, BOQ or reference, target dimensions, quantity, destination, functions, finish, mounting, packaging, and schedule.
Project RFQ
Share what is already known. Dimensions, construction, electrical details, mounting, finish, packaging, and documentation can then be reviewed in one project brief.
Open WeChat and scan this QR code to contact our team.