OJMIRROR — AIRPORT & TRANSIT MIRROR TECHNICAL REVIEW Planning checklist, revision 2026-10-13. Not an approved product specification. 1. PROJECT: facility, market, room types, stage, design contact, quantity and phases. 2. DIMENSIONS: overall W x H x D, units, reflecting area, survey status and tolerances. 3. CONSTRUCTION: proposed glass/substrate, thickness, edges, frame/finish and required safety evidence. 4. MOUNTING: actual wall substrate, backing, fixing responsibility, retention, lifting/tool clearance and replacement method. 5. LIGHTING: illuminated or non-illuminated; required color, output, rendering and visual mock-up. 6. ELECTRICAL: project supply, selected driver rating, control interface, wiring, isolation and access. 7. ACCESSIBILITY: reflecting-surface height, useful sightlines, room approach and controls; qualified review against applicable rules. 8. DOCUMENTS: model and revision-specific dimensions, mounting/wiring details, installation/care instructions and requested compliance records. Confirm CAD/BIM availability; do not assume it. 9. SAMPLE: agreed finish and configuration, room mock-up review, approval record and unresolved changes. 10. INSPECTION: agreed dimensional/visual/function checks, acceptance criteria and required records. 11. PACKING: mirror/room marks, protection, handling route, phase labels and quantity reconciliation. 12. HANDOVER: drawings, care instructions, replacement references, spare schedule and service responsibility. Contact: info@ojmirror.com Inquiry and drawing submission: https://www.ojmirror.com/contact/ Do not install from concept drawings or architectural visualizations.