OJMirror | Healthcare Mirror Project Checklist Use this checklist as an editable project brief. Leave undecided items as “to confirm”. It is a planning aid, not an installation drawing or a certificate of compliance. 1. PROJECT OVERVIEW Facility type: Country / city: New build / renovation / replacement: Project stage: Required on-site date: Installation phases: 2. ROOM AND MIRROR SCHEDULE — repeat for each variation Building / floor / room type: Mirror reference: Installed quantity: Spare quantity (kept separate from installed quantity): Mirror family: LED / framed / frameless / cabinet / full-length Overall width x height x depth, including units: Reflective area and intended position: Frame material / profile / finish reference: Glass / edge / backing requirements: Drawing number and revision: Open decisions / responsible person / confirmation date: Create a separate reference if size, finish, function, fixing or cabinet handing changes. 3. LIGHTING AND CONTROLS Frontlight / backlight / combined / unlit: Requested color temperature and performance data: Control / dimmer reference: Supply voltage and connection method: Desired switching and power-restoration behavior: Demister area and activation, if required: 4. INSTALLATION AND DAILY CARE Wall build-up and fixing zones: Cable exit and connection space: Nearby basin / grab rails / accessories / door clearances: Responsible design-team review of accessible layout: Installation and removal route: Driver or component access: Proposed cleaning products and method: Care instructions and maintenance records required: 5. SAMPLE APPROVAL Sample scope and quantity: Appearance and finish review: Lighting and control checks: Mounting / clearance / service-access checks: Approved drawing revision and finish reference: Outstanding decisions, owners and dates: 6. COMMERCIAL SCOPE AND HANDOVER Included / excluded: samples, development, accessories, spares, packing, freight: Required configuration-specific reports / documentation: Inspection criteria and records: Carton marks and packing-list references: Receiving and storage arrangements: Damage reporting process: Warranty terms and replacement-parts arrangement: Packing-list / carton / approved-schedule reference match: Receiving contact, unloading access and phase grouping: Replacement record: original order, mirror reference, revision, photos and component details: Later-order finish matching and component availability to be reconfirmed: Sample approval / production release / dispatch / on-site milestones: 7. AVAILABLE ATTACHMENTS Room list / elevation / electrical plan / finish reference / measured site photos: Send the reviewed brief and drawings to info@ojmirror.com.